Duckmaloi BridgeDuckmaloi Bridge
Roads and Maritime wht

Duckmaloi Bridge

Bridge maintenance and barrier upgrades were carried out on the Duckmaloi Bridge (crossing the Duckmaloi River 15km east of Oberon) for compliance reasons. Work included paint repair, scour remediation and a barrier upgrade.

Align-A-Cut were involved with the removal of the existing cast barrier kerb, which involved deep cutting using both the wall saw and the wire saw, and core drilling for the new king posts.

contact us